(see fig. B on side a + b.)

The school building has only one entrance from High Street. But as the greater part of the population of this street belongs to a very low class, it is intended to shut the entrance from that street and to make a new entrance from the Western Street through the compound of the Basel Mission. But as the level of this compound is twelve feet lower than the level of the school, a verandah is to be erected with a staircase leading down from the school to the Basel Mission compound (see fig. C.)

Copy 554 Estimate

Messrs Bird + Palmer, architects in Hong Kong, have made a plan and an estimate for the enlargement and improvement of the Basel Mission school in High Street as shown above, and Mr. Wong Ato, contractor in Hong Kong, is ready to execute this plan for six hundred dollars.

(signed) by Renoch.

Edit History

2026-05-25 21:11:42 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
(see fig. B on side a + b.) The school building has only one entrance from High Street. But as the greater part of the population of this street belongs to a very low class, it is intended to shut the entrance from that street and to make a new entrance from the Western Street through the compound of the Basel Mission. But as the level of this compound is twelve feet lower than the level of the school, a verandah is to be erected with a staircase leading down from the school to the Basel Mission compound (see fig. C.) Copy 554 Estimate Messrs Bird + Palmer, architects in Hong Kong, have made a plan and an estimate for the enlargement and improvement of the Basel Mission school in High Street as shown above, and Mr. Wong Ato, contractor in Hong Kong, is ready to execute this plan for six hundred dollars. (signed) by Renoch.
Baseline (Original)
(see on (see side a + b on fig. B.) The school building one entrance has only from High Street. But as the greater part of the population of this street belongs to a very low class, it is intended to shut the entrance from that street and to make a new entrance from the Western Street through the compound of the Basel Mission. But as the level of this compound is twelve feet lower than the level of the school, a verandah is to be erected with a staircase leading down from the school to the Basel Mission compound (see fig. C.) Copy 554 Estimate Messrs Bird +Palmer, architects in Hong Kong have табара plan and an ade a plan estimate for the enlargement 丸旅 and improvement of the - Basel Mission school in High Street as shown above and Mr. Wong Ato, contractor in Honghong is ready to excente this plan" for six hundred dollars. (eignet) by Renoch.
2026-05-25 21:11:42 · Baseline
View content

(see

on

(see side a + b on fig. B.)

The school building

one entrance

has only

from High Street. But as the greater part of the population of this street belongs to a very low class, it is intended to shut the entrance from that street

and to make a new entrance

from the Western Street through the compound of the Basel Mission. But as the level of this compound is twelve feet lower than the level of the school, a verandah is to be erected with a staircase

leading down from the school to the Basel Mission compound (see fig. C.)

Copy

554

Estimate

Messrs Bird +Palmer,

architects in Hong Kong have

табара

plan and an

ade a plan

estimate for the enlargement

丸旅

and improvement of the - Basel Mission school in High Street as shown above and Mr.

Wong Ato, contractor in Honghong is ready to excente this plan" for six hundred dollars.